The Lost Bus

Coming in

2025

The Project:

Mountain road set constructed in six days on a studio back lot.

The process

A last-minute decision was made to create the set for a controllable fire sequence. In less than a week my team was able to excavate the road, to a depth of eight feet, create a twenty-four-foot roadside cliff, harvest the material and complete the set.